Engineer 1 - Plant Integ, Erection & Comm

03 Oct 2016
18 Nov 2016
Oil and Gas
Contract Type
Full Time
The role of the piping engineer is as follows:
• Perform piping layouts design as per the time schedule.
• Provide all necessary isometrics as per the time schedule.
• Coordinate with the stress and supports engineer and ensure a clash free piping system design.

Essential Responsibilities

• Compliance with the Quality and EHS rules from the project, business, sector and corporate within the own area of responsibility
• Supports Lead Engineer Piping in their project activities
• Ensures that he is always up to date for the available new technologies and the current codes and standards
• The Piping Layout Engineer has the technical and time schedule responsibility to create (mainly 3D model) and supply (drawings, isometrics and reports) to different Customers (internal or external) the piping arrangement information as per the batch assigned by the Lead Engineer Piping.
• Ensure that the design of his Engineering function is according to the applicable rules, regulations, codes and standards and according to good engineering practice especially with regard to Environmental aspects and Health & Safety of Site Personal, Operators, Maintenance personnel and third parties
• Integrating Client's operational and maintenance experiences into conceptual design
• Optimizing Plant Design by integrating Civil/ Steel requirement as well as information from mechanical
• Set-up and Maintenance of PDMS 3D Model in all stages of a project (concept through Study Phase up to DE)
• Performs pipe studies for complex systems in close co-operation with support and stress engineer
• Comply with the forecast dates for information & drawings submission. Provide information to prepare the flat-file to follow-up the piping design progress upon request by L.E
• Checking all existing piping, detail and isometric drawings on dimensions, routing, process (PI&D's) requirements, operation, maintenance and clashers, on the basis of the "Standard Checking Procedure";
• Estimate the Piping MTO
• Check & comment external documents (Partners, Sub Contractors) and manage & check the interface data (type, dimensions, location, ...)
• Participate to or assume the follow-up of piping detail subcontracted studies
• Inform Lead Engineer Piping of any difficulties regarding adaptation of manpower according to the needs
• React to any missing information
• Manage the team in charge of the engineering scope of supply and/or services assigned to him
• React to any site requirements and assume the necessary tasks to operate the NCR processing. Input the as-recorded information inside the tools and drawings
• Analyse client's comments and prepare answers duly argued
• Participate to the design review and the design freeze
• Ensure experience feedback from the project. Help to solve the closeout of the punch item list to obtain PAC and FAC and to organize archive of final documentation
• Takes over Area Lead function during DE / EPC Execution


• Degree in Mechanical Engineering or Diploma with extensive work experience.
• Experience in Piping/ Plant Design for power, petrochemical, chemical, oil and gas Industry with at least 5-7 years in the power plant design and good knowledge appropriate to the technical activity involved, including interface clarification beyond this activity
• Experience in working in 3D Plant Design environment of PDMS.
• Experience in interacting with cross functions and managing interfaces
• Preparation of piping isometrics and piping GA drawings

Desired Characteristics

Strong oral and written communication skills. Strong interpersonal and leadership skills. Ability to work independently. Strong problem solving skills.